Office and medical building roofing while you stay open
Most office and medical roofs are repaired and replaced while the building is in use. People below are working and seeing patients, and they expect the building to run normally. The roof work has to fit around them, not the other way around.
Why do occupied buildings change the job?
Office parks in the Denver Tech Center and low- and mid-rise offices along I-25 usually have familiar roofs. So do medical office buildings, outpatient clinics, dental practices and imaging centers. Expect TPO, EPDM or built-up roofing, crowded with HVAC units, exhaust fans, conduit and curbs. Most of their leaks start at a curb or penetration rather than in the open field of the roof.
What makes office building roofing different is everything around the roof. Tenants have leases and expectations. Patients may be sensitive to odors and dust. Server rooms, records, labs and imaging equipment sit under the deck.
A re-roof on an occupied office or medical building is as much a planning job as a roofing job. Your plan has to be in place before the first section is opened.
What do office tenants care about?
- No water in their suite. Above all, a re-roof must not cause the leak it was meant to prevent. That means daily dry-in and a plan for afternoon storms.
- Quiet when it matters. Tear-off and fastening into a steel deck carry through to the top floor. Meetings, calls and focused work need to be scheduled around.
- No fumes. Odors drawn into rooftop air intakes reach every floor.
- Normal access. Entries, parking and loading stay open and safe.
- Notice. Tenants want dates, what to expect and a name to call, before the work starts and as it moves across the roof.
What do medical buildings add?
- Air quality. Some patients may have breathing conditions, and rooftop air handlers feed exam and procedure rooms. Intakes near the work are closed, filtered or scheduled around with the facility team.
- Infection control. Hospitals and many healthcare facilities require an infection control plan for construction work. Ask your facility team what applies. We plan the work within it.
- Sensitive rooms below. Imaging suites, labs, sterilization areas, pharmacies and records can't take a drip. They're mapped before work starts. Tear-off over them is scheduled for the safest hours, with interior protection where needed.
- Vibration and noise. Fastening and tear-off near procedure rooms are scheduled outside procedure hours.
- Patient access. Drop-off areas, accessible routes and entries stay clear of staging and crane lifts.
How should the work be planned?
Pre-construction meeting
Meet with the property or facility manager. Cover work hours, roof access, air intakes, sensitive areas, contacts, emergency procedures and any building rules for contractors.
Map what's below
Mark suites, server and IT rooms, labs, imaging, records and anything else that can't get wet on a roof plan. Then each section's work fits what's under it.
Send notices
Tenants, staff and, where it helps, patients get dates by section and a contact name, with updates as the work moves.
Phase and dry in daily
Only open what can be made watertight before the crew leaves. Summer afternoon thunderstorms are common during hail season, so the forecast sets how much gets opened.
Coordinate equipment
We disconnect and reset rooftop units with your HVAC contractor. Curbs are raised to suit new insulation, and crane lifts happen off-hours.
Close out
A final walkthrough with the manager. Final payment isn't collected until you sign off, and warranty records go in your file.
How do you control odor, noise and dust?
Odor
Hot asphalt kettles on built-up roofs give off a strong smell, and some adhesives and primers do too. Heat-welded TPO with mechanical attachment needs no kettle, and lower-odor adhesives are worth asking about. Whatever the system, keep odor sources away from intakes and have the outside air dampers near the work closed. Fumes drawn into intakes can also set off smoke detectors. You may need to coordinate with your alarm company.
Noise and vibration
Tear-off, power fastening and equipment moves are the loud parts. Over sensitive suites, they can be scheduled early, after hours or on weekends. That has to fit local noise rules and the building's own hours.
Dust and debris
On steel decks, tear-off debris and dust can fall through gaps and fastener holes into the ceiling space. Areas under sensitive rooms are protected before tear-off. The roof is kept clean, so nothing ends up in the gutters or on cars below.
How do you keep an occupied building safe?
- Controlled zones or overhead protection at entries and walkways near the work
- Crane lifts with temporary closures scheduled before or after business hours
- Staging, dumpsters and material away from patient drop-off and main entries
- Fall protection under a written safety program on every job (see our safety program)
Repair, recover or replace: which disrupts least?
Not every aging roof needs a full tear-off. If the insulation is dry, a recover avoids most of the noise, debris and exposure of tearing off. It can often be done with less disruption to the floors below. An infrared moisture survey with core cuts tells you whether that's an option. Codes generally don't allow a recover where there are already two roofs.
When commercial roof replacement is the answer, TPO is a common choice on office and medical buildings. Its white surface lowers cooling loads, and its welded seams can be repaired for years. With a tear-off, you generally have to bring insulation up to the current energy code. That can raise curbs and edge heights. Re-roofs also generally need a permit, so check with your city's building division. For more, see commercial roofing systems, the commercial roofing section and commercial roof cost factors.
Questions to ask before you hire a roofer
- How much of the roof will be open at once, and how is it dried in at the end of each day?
- Which system and attachment method do you propose, and which steps make odor or noise?
- Who coordinates rooftop unit shutdowns and crane lifts with our HVAC contractor, and when?
- Who is the single point of contact for our tenants or staff?
- Can you send your safety program and insurance certificates for the building's file?
We carry $2M general liability, a $5M umbrella and workers' comp on every employee. We send certificates with the proposal, and you'll get a written contract from us.
What if the roof leaks while the building is occupied?
Is water coming through a ceiling over a suite or exam room? Protect people and equipment first. Move what you can, cover what you can't, and keep people away from wet floors and electrical equipment. Then call us first if water is coming in, at (720) 296-0000, or report a leak. Our guides to first steps for a commercial roof leak and rooftop HVAC curb leaks explain what usually causes them.
The best way to avoid leak calls is regular maintenance. NRCA recommends inspecting low-slope roofs at least twice a year and after severe weather. Our S.M.a.R.T. program follows that schedule, with a written report you can share with owners and tenants.
Office and medical roofs near you
We work on office and medical roofs throughout the metro. That includes the office corridors in Greenwood Village and Centennial near our office, and Lone Tree. Our projects page shows how we approach each building type. Planning a commercial roof repair or replacement on an occupied building? Request an inspection, and we'll put together a scope and a schedule that fits your tenants or patients.
Office and medical building roofing FAQs
Can you replace our roof while tenants are in the building?
Yes. Most office and medical re-roofs are done over occupied floors. We phase the work by section and make each section watertight before the crew leaves. Noisy work is scheduled around your tenants.
Will the roof work smell inside the building?
It shouldn't, if the work is planned well. Use a system without an asphalt kettle, or lower-odor adhesives. Keep odor sources away from intakes, and close outside air dampers near the work.
Can work happen after hours or on weekends?
Yes, where the building allows it and within local noise rules. Tear-off over sensitive suites and crane lifts are often scheduled that way.
Our clinic has an infection control policy. Can you work within it?
Yes. Share it with us before we price the job. Then the schedule, intake protection, interior protection and cleanup are built into the scope.
What happens if it rains while the roof is open?
We only open what can be closed before the crew leaves, watch the forecast and keep temporary tie-ins ready. If a storm comes in early, the open section is sealed before the rain arrives.